Current Location: Home > Project Case >Clearance of 300000 ton foreign oil tanker
The 300000 ton foreign oil tanker was cleared and entered the factory according to the standard. The shipowner required a length of less than 2 meters, and the construction period was 5 days. The actual construction period was 4 days, and it was successfully completed, meeting the shipowner's acceptance standards.